National Grid will invite tenders for its new superfast frequency response service on 15 April. The system operator seeks an initial 200MW, but sees the service as an enduring regime as the UK power system continues to lose inertia.
Technical details of the Enhanced Frequency Response service – which requires sub-second responses to deviations from the power systems standard 50Hz to prevent faults – are being fine-tuned. However, National Grid has published further details.
Successful bidders will receive four year contracts, which National Grid believes strikes a balance between risk and reward for those looking to own and operate assets, which in the main are likely to be batteries. However, the auction is technology-neutral. Interconnectors, other forms of energy storage and even aggregated domestic batteries will not be prevented from making a bid, provided they meet the 1MW minimum requirement, can connect to Grid’s systems and have the relevant data.
How those assets will impact distribution networks, and what the implications may be for operators’ connection agreements is something the national and local grid operators are set to thrash out.
National Grid is also set to broaden the scope of Enhanced Frequency Response so that its definition also covers primary and secondary response. While the system operator originally mooted a 9 second minimum response duration, that may now be extended. National Grid says it may also develop in parallel another service for short duration, fast-response characteristics for post-fault frequency control.
Publishing proposed timelines for the EFR service, alongside an FAQ document, National Grid also outlines tender criteria, how performance failures will affect payments, and how service providers may work with other balancing mechanisms.
See the FAQ, timeline and other Enhanced Frequency Response details here.
Related stories:
Free download: Demand side response report 2015
National Grid plots superfast grid balancing service
Decc commits to annual plan and to consult on energy storage
UK must commit to smartgrid says National Infrastructure Commission
Major changes to capacity market proposed
Hot technology: energy storage via heat battery
Western Power Distribution ramps up demand-response trials, calls for participants
Smart grids ‘require local control and businesses must play or pay’
40% of firms say they could shift energy use as National Grid asks them to turn up
Dong enters demand-side response market with wind power balancing service
National Grid buys 475MW of demand response to cover winter
Government to consult on demand response in spring
Flexitricity blasts transitional capacity market as Npower plots supermarket sweep
Grid buys 3.6GW of back up power to prevent blackouts
Flexitricity warns demand response cannot be rushed as winter looms
National Infrastructure Commission to focus on energy storage and demand response
National Grid plots superfast grid balancing service
National Grid moots demand side response rule changes as winter power margins tighten
National Grid must simplify demand response to bring in UK businesses
Ofgem boss flags rule changes to speed demand response
National Grid launches major demand side push
Demand response: Suppliers and aggregators ignoring 80% of UK firms
UK firms with CHP plant could be paid to stop exporting power
National Grid: No margin? No sweat
Demand response provider teams with Honeywell, touts for new business
Free report: Directors’ energy outlook report 2016
Free report: How to finance energy efficiency
Follow us at @EnergystMedia. For regular bulletins, sign up for the free newsletter.